Re: Crossrail link to Reading hangs in the balance



Tom Anderson wrote:
On Fri, 4 Jan 2008, paulweiser@xxxxxxxxxxx wrote:

My completely off-the-wall idea is to join up Crossrail with the
Hammersmith & City and run Crossrail trains (from Shenfield) that
would otherwise terminate at Paddington on to Hammersmith.

You're not the first person to suggest this. I can't remember who
was, at least on utl, but it's a cudgel i've taken up. It's an
excellent idea.
The pattern could be:

4 fast Heathrow
4 slow Heathrow
8 Maidenhead / Reading
8 Hammersmith

Or 12 Hammersmith if Ken can't get BAA to agree to HeX on Crossrail.

Which they won't.

Current plans, the last i heard, only have 10 tph going beyond
Paddington - 4 tph to Heathrow, 2 tph to West Drayton, and 4 tph to
Maidenhead, all all-stops, i think, although exactly what happens at
the far end is still up in the air. That's 14 tph to dispose of at
Paddington, which would be a doubling of the current H&C frequency.

I think the constraint on frequency at Heathrow is the need to
reverse. This is one reason the Airtrack plan is such a good one -
you can run trains on from T5 to Staines and reverse there, where
there's room for a higher-capacity layout. That would let more trains
go to Heathrow (well, Staines), although at the expense of other
destinations i think.

Not sure about that Tom, doesn't the current airtrack proposal only have
terminating trains from Staines originating both at Waterloo, and from the
Woking direction (including Guildford). In other words the 'HEx' tracks at
T5 are arranged as entering one pair of platforms, from the central area,
alongside a currently unused space for trains from the 'airtrack' route
only. Side by side two platform terminii, rather than a four platform
through station?

Clearly if Crossrail had dual voltage units there is no basic reason they
couldn't carry on onto the SW lines, but does the T5 station even allow for
this future possibility?

Paul S


.



Relevant Pages

  • Re: Crossrail link to Reading hangs in the balance
    ... My completely off-the-wall idea is to join up Crossrail with the ... would otherwise terminate at Paddington on to Hammersmith. ... terminating trains at Paddington. ...
    (uk.transport.london)
  • Re: Publicity about Circle Line going Teacup
    ... Road - Hammersmith, running in both directions) then you have ... you effectively have a Hammersmith - Edgware Road shuttle, ... Crossrail (6tph but 12 carriage trains), with H&C trains only using it for ... Uxbridge to go no further than Baker Street. ...
    (uk.transport.london)
  • Re: Crossrail link to Reading hangs in the balance
    ... would otherwise terminate at Paddington on to Hammersmith. ... Current plans, the last i heard, only have 10 tph going beyond Paddington ... This is one reason the Airtrack plan is such a good one - you can run trains on from T5 to Staines and reverse there, where there's room for a higher-capacity layout. ... Wimbleware trains would continue beyond Edgware Road, providing for the first time since 1868 a proper much-needed frequent service from west to north Circle, dramatically improving performance by removing the conflicts and bottleneck west of Edgware Road. ...
    (uk.transport.london)
  • Re: TLink 2000 or Crossrail, which makes more sense?
    ... That could be avoided by splitting and joining trains on the Brighton Line ... Crossrail has been chopped around, til it is the bare skeleton of its ... From there the tunnelling starts, under Moorgate and Liverpool Street, to ... Instead of tunnelling all the way from Paddington to Liverpool Street, ...
    (uk.railway)
  • Re: London Terminii - Saturation?
    ... Thameslink 3k and Crossrail will reduce a lot of pressure on Kings ... Cross, Liverpool Street and Paddington. ... and the longer trains will have much greater capacity. ... I am not aware that the number of peak time passenger arrivals in ...
    (uk.railway)