Re: rail versus national express



Mark B wrote:
Philip Hardy wrote:
encouraging the airlines to put
another wasteful domestic flight in the air.


Domestic Flights do have their place.
Exeter to Scotland by train ~ 9 hours
Car - probably about the same maybe more.
Coach - Full Overnight
Flight - 90 mins

But then down here in the South West we arn't going to justify an HSL, or any other flightbuster. So 1 or 2 flights in a Dash 8 per day (about 70-140 people given the breakeven levels of a frugal turboprop) is probably the best way to do things given the ground based alternatives for the forseeable future

*Sigh*. I must remember to be more precise when posting here.

Yes. I agree with you - the example you state is quite fair except the the journey time from from Exeter to Edinburgh on a direct train is between 7 hours 34 mins and 8 hours 6 mins. Of course EDB isn't the only place in Scotland - Perth is around the 9 hour mark. I had in mind flows like Manchester - Glasgow, Newcastle to London and the like.
.



Relevant Pages

  • Slowly up the withered arm
    ... Having spent some time in Exeter, I was ready to return yesterday evening on ... the 16:26 SWT service to Clapham Junction, arriving 19.41, which should ... 'route Honiton' options only start appearing on page three, ... train had not, in fact, yet left Honiton, and we would be at Pinhoe for at ...
    (uk.railway)
  • Re: Kettle gets stuck in Exeter
    ... The line is double to Pinhoe (on the edge of Exeter) then single ... | outskirts of Salisbury (with loops at Gillingham and just East of Tisbury) ... train could not then proceed on its journey to Yeovil (assuming it ... service that can reliably be passed, and the new Route Utilisation Strategy ...
    (uk.railway)
  • Re: Kettle gets stuck in Exeter
    ... The line is double to Pinhoe (on the edge of Exeter) then single ... | outskirts of Salisbury (with loops at Gillingham and just East of Tisbury) ... For the benefit of others who may be puzzled by this response, I presume you mean that the time lost going through this procedure would mean that the train could not then proceed on its journey to Yeovil without causing excessive delays to other services on the single line sections due to not running through at the planned time. ... At certain times of day this route is planned to carry almost the maximum service that can reliably be passed, and the new Route Utilisation Strategy includes proposals for a new double track section and a new loop to allow for traffic growth. ...
    (uk.railway)
  • Re: Passing trains ... flying coffee
    ... But there has always been the downside of another train passing at speed, causing the "clout on the side of the head" effect to anyone dozing off against the coach side. ... This is one of the reasons the Mark 3 is so comfortable. ... I have never seen any hint that the Mark 3 bodies are suffering from any form of cracking due to the number of load cycles they have been through. ... This load cycle cracking did occur to the first design of the bogie axle swing arms: these were all replaced by a modified design with a deeper section very early on in their lives. ...
    (uk.railway)
  • Re: Night Mail film celebrated
    ... It is 75 years since the ground-breaking documentary film about the ... mail train from Euston to Scotland was first screened. ... of the 1930s, including Night Mail. ...
    (uk.railway)