Re: Shoreditch ELR connections and the new extension
- From: "Recliner" <nigelp@xxxxxxxxxxxxxxx>
- Date: Fri, 11 Jan 2008 22:49:54 -0000
"Charles Ellson" <charles@xxxxxxxxxxxxxxxxxx> wrote in message
news:58dfo3d9m9ruumlanrbva1gjcd2723f4r1@xxxxxxx
On Fri, 11 Jan 2008 09:52:08 -0800 (PST), MartinM
<martinm3@xxxxxxxxxxx> wrote:
On Jan 11, 2:20 pm, "Clive D. W. Feather" <cl...@on-the-If the ELL is being maintained by LU then the curve is likely to be
train.demon.co.uk> wrote:
Presumably the high level viaduct over the GEML was part of the
goods depot and not connected to the ELR
Not by direct rail, no, but there was a wagon hoist between them.
thanks Clive;
presumably the St Mary's curve is now permanently OOU as the new
stock will not be compatible?
needed for access by engineering trains. If the curve is double-track
(I've never been down that way) then there would probably be room for
NR-sized stock to use it if it was singled (or interlaced?) but
further clearance issues for e.g. anything Mk3-sized would apply on LU
but IIRC would not totally prevent passage over the north side of the
Circle Line if stock was taken to various LU depots.
I believe it's double track, but with such tight clearances that A and D
stock trains are not allowed to pass each other on the curve. It's not a
problem when only ECS and maintenance trains use it.
.
- Follow-Ups:
- Re: Shoreditch ELR connections and the new extension
- From: MartinM
- Re: Shoreditch ELR connections and the new extension
- References:
- Shoreditch ELR connections and the new extension
- From: MartinM
- Re: Shoreditch ELR connections and the new extension
- From: Mr Thant
- Re: Shoreditch ELR connections and the new extension
- From: MartinM
- Re: Shoreditch ELR connections and the new extension
- From: Clive D. W. Feather
- Re: Shoreditch ELR connections and the new extension
- From: MartinM
- Re: Shoreditch ELR connections and the new extension
- From: Charles Ellson
- Shoreditch ELR connections and the new extension
- Prev by Date: Donny built 56's at....Knottingley M.P.D.
- Next by Date: Re: Pendolino-no-no-no
- Previous by thread: Re: Shoreditch ELR connections and the new extension
- Next by thread: Re: Shoreditch ELR connections and the new extension
- Index(es):
Relevant Pages
|