Re: Ely derailment




"Roland Perry" <roland@xxxxxxxxxxx> wrote in message
news:zWyn7pEmtghGFA84@xxxxxxxxxxxxxx
In message <1183185425.423249.159560@xxxxxxxxxxxxxxxxxxxxxxxxxxxx>, at
23:37:05 on Fri, 29 Jun 2007, Ian <ian.groups@xxxxxxxxxxxxxx> remarked:
http://news.bbc.co.uk/1/hi/england/cambridgeshire/6229906.stm

I am told that they are expecting it to take three weeks to build an
access road for the cranes. I look forward to the flood of postings
from armchair experts who know better ways of solving the problem ...

According to one source within EWS's breakdown crew there is "photographic
evidence of a wheelset defect"


Tom Burton


.



Relevant Pages

  • Re: Ely derailment
    ... I am told that they are expecting it to take three weeks to build an ... access road for the cranes. ... Was it the track/bridge giving way under the train, or did one or more trucks become derailed and then drag along the bridge deck tearing it apart? ...
    (uk.railway)
  • Ely derailment
    ... I am told that they are expecting it to take three weeks to build an ... access road for the cranes. ... I look forward to the flood of postings ...
    (uk.railway)
  • Re: Ely derailment
    ... Ian wrote: ... I am told that they are expecting it to take three weeks to build an ... access road for the cranes. ...
    (uk.railway)
  • Re: Possible Pins FS in Delaware
    ... I wasn't expecting the flood of Email's that I got. ... will be in touch if I need to move some pins. ... I'm saving all the ...
    (rec.games.pinball)
  • Re: What will happen to Hogwarts?
    ... I'm expecting a flood at some ... point as part of the battle to evict the DEs from Hogwarts. ...
    (alt.fan.harry-potter)