Re: Weymouth Quay



In message <1183231411.273270.20550@xxxxxxxxxxxxxxxxxxxxxxxxxxx>, Boltar <boltar2003@xxxxxxxxxxx> writes
I imagine this has been asked a million times before but ... I was
down in Weymouth recently and saw the rather overgrown track leading
out from the station down to the quay so I was just wondering when it
was last used? Is it all still intact and just "mothballed" or has
part of it already been lifted?

B2003

I was on holiday there a few weeks ago and walked the entire length. It is all still intact apart from building work going on at the far end of the Quay Station and a moveable set of steps obstructing the line to give access to the platform. The road was being dug up near Debenhams for gas main work but they were carefully going around the rails.

I heard that the last train was 1999 but not sure if that is correct.
--
John Mann
.



Relevant Pages

  • Re: Primrose Hill
    ... stage, I think quite soon) fascinating - a dead station, but otherwise ... its semi-derelict state between closure and the abandonment of the ... otherwise almost intact". ...
    (uk.railway)
  • Re: Statues at St Pancras Int
    ... The door at the side that overlooks the Gym and the KX Suburban platforms ... (currently obscured by building work) ... secret exit to the Circle tube line at the 'old front' of the station. ... You may feel its a 'secret', I reckon a passenger arriving at the station ...
    (uk.railway)
  • Re: Weymouth Quay
    ... down in Weymouth recently and saw the rather overgrown track leading ... out from the station down to the quay so I was just wondering when it ...
    (uk.railway)
  • Re: How are the mighty fallen
    ... Skegness - although the station is intact six platforms for an hourly ...
    (uk.railway)
  • Kidderminster station today
    ... Glimpsed the station over the bridge parapet and there seems to be a ... lot of building work going on. ... Does anyone know what is being built, ...
    (uk.railway)