Re: GNERstars returning to Eurostar
Neil Williams wrote:
>
> I wonder if they'll be used on the quieter Bruxelles route, for which
> their smaller capacity will be by far sufficient.
>
> Neil
>
Perhaps they would suit the off-peak Bxls services, but the peak time
trains can often be so full that there are very few free seats in first
class. I doubt they would want to reduce capacity on these trains.
Maybe they could offer shorter, more frequent, trains, but I'm not sure
that there is scope for this as the Bxls-London service is already
hourly between 16:00 and 19:00.
Tony
.
Relevant Pages
- Re: GNERstars returning to Eurostar
... Neil Williams wrote: ... Perhaps they would suit the off-peak Bxls services, ... I doubt they would want to reduce capacity on these trains. ... (uk.railway) - Re: What happened to "DMUs"
... XC trains from the south at York, and double up more trains on the ... unelectrified with no obvious capacity enhancements coming soon - I'd ... case for TPX electrification once we've got the others, ... BNS to other passengers. ... (uk.railway) - Re: vehicles per hour - road and transit
... The theoretical maximum capacity of a freeway lane is about ... it is unrealistic to confidently suggest that a highway lane ... The important thing is whether a highway or transit link can ... build heavy rail transit with a dozen trains an hour around rural areas. ... (misc.transport.road) - Re: =?windows-1252?Q?NR=92s_=91FURTHER_WORK=92_ON_NXEC_?= =?windows-1252?Q?TIMETABLE_FAILS_T
... trains being pathed first and everything else fitted around them. ... And they are going to have to work with these operators to achieve the desired stopping patterns, journey times and levels of capacity. ... First Hull Trains and Grand Central need to be told that their route is full and that the best way to make use of the available capacity is to have a standard clock face timetable. ... (uk.railway) - =?windows-1252?Q?Re=3A_NR=92s_=91FURTHER_WORK=92_ON_NXEC_TIMETABLE_FAIL?= =?windows-1252?Q?S
... merely offering more excuses why journey times can’t be improved. ... additionally at Northallerton. ... trains being pathed first and everything else fitted around them. ... journey times and levels of capacity. ... (uk.railway) |
|