Mars Odyssey THEMIS Images: October 29 - November 2, 2007
- From: baalke@xxxxxxxxxxxxx
- Date: Fri, 02 Nov 2007 09:25:39 -0700
MARS ODYSSEY THEMIS IMAGES
October 29 - November 2, 2007
o Collapse Tube (Released 29 October 2007)
http://themis.asu.edu/zoom-20071029a
o Draining the Highland (Released 30 October 2007)
http://themis.asu.edu/zoom-20071030a
o Dust Devil Tracks (Released 31 October 2007)
http://themis.asu.edu/zoom-20071031a
o Argyre Basin Dunes (Released 01 November 2007)
http://themis.asu.edu/zoom-20071101a
o More Argyre Dunes (Released 02 November 2007)
http://themis.asu.edu/zoom-20071102a
All of the THEMIS images are archived here:
http://themis.asu.edu/latest.html
NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey
mission
for NASA's Office of Space Science, Washington, D.C. The Thermal
Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona
State
University. Lockheed Martin Astronautics, Denver, is the prime
contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.
.
- Prev by Date: Phoenix Mars Lander Status Report: Tasks En Route to Mars Include Course Tweak, Gear Checks
- Next by Date: Cassini Update - November 2, 2007
- Previous by thread: Phoenix Mars Lander Status Report: Tasks En Route to Mars Include Course Tweak, Gear Checks
- Next by thread: Cassini Update - November 2, 2007
- Index(es):
Relevant Pages
|