Re: US 151 Fond du Lac, WI bypass upgrades planned
- From: Jon Enslin <jenslin@xxxxxxxxxxx>
- Date: 9 May 2007 14:02:17 -0700
On May 4, 7:39 pm, "Michael G. Koerner" <mgk...@xxxxxxxxxx> wrote:
http://www.fdlreporter.com/apps/pbcs.dll/article?AID=/20070503/FON010...
This entire project is not yet even complete (the part west of US 41 opens
this fall) and major safety upgrades are already having to be made.
This was soley the result of being cheap - this project should have been built
as a full freeway at the start, complete with free-flow ramps at US 41 and WI
23 east (Johnson St pointing towards Sheboygan). We told WisDOT so at the
PIMs and public hearings several years ago when this was all being planned, too.
I wonder how many of WisDOT's other recent 'built on the cheap' bypasses will
also be needing similar near-term work.
They have installed two lights on the Whitewater bypass and have made
some changes at the Oconomowoc ones already too.
Not to mention the lives lost in all three places due to WIDOT cutting
corners.
Jon
.
- Follow-Ups:
- Re: US 151 Fond du Lac, WI bypass upgrades planned
- From: John Repp
- Re: US 151 Fond du Lac, WI bypass upgrades planned
- References:
- US 151 Fond du Lac, WI bypass upgrades planned
- From: Michael G. Koerner
- US 151 Fond du Lac, WI bypass upgrades planned
- Prev by Date: Re: Traffic signal synchronization
- Next by Date: Re: US 151 Fond du Lac, WI bypass upgrades planned
- Previous by thread: Re: US 151 Fond du Lac, WI bypass upgrades planned
- Next by thread: Re: US 151 Fond du Lac, WI bypass upgrades planned
- Index(es):
Relevant Pages
|