Re: Least expensive way to build grade-separated infrastructure
- From: JG <jgrove24@xxxxxxxxxxx>
- Date: 30 Apr 2007 10:21:26 -0700
On Apr 30, 6:30 am, Larry Gross <gross.la...@xxxxxxxxx> wrote:
.. with the caveats that it's got to be fully-functional.... and no
consideration of right-of-way EXCEPT to consider the size of the
necessary footprint... in relative terms...
this might be a stupid question... so if it is.. flame away...
A tight urban area could be served by an 80 foot wide foot print with
a double stack configuration ala frisco. First level is built on fill
to prevent
premature bridge wear for that part, level 2 is standard stilt
structure.
Please leave my consulting fees at Chicago Ogilvie station in the
Onion
honor box...JG
.
- References:
- Least expensive way to build grade-separated infrastructure
- From: Larry Gross
- Least expensive way to build grade-separated infrastructure
- Prev by Date: Re: Bloomberg Memorial Tunnel, $8 Manhattan Toll
- Next by Date: Re: m.t.r. rebound?
- Previous by thread: Re: Least expensive way to build grade-separated infrastructure
- Next by thread: Re: Least expensive way to build grade-separated infrastructure
- Index(es):
Relevant Pages
|