One last time... Sub summaries, variable lists, and whatnot...
- From: "Teresa K." <teresa.kabourek@xxxxxxx>
- Date: Thu, 23 Aug 2007 13:40:41 -0700
I am still having issues with this problem.. Many of you all have
helped me so much, and what I've learned I've been able to apply
elsewhere, but this is a true monkey on my back. Please help, or ask
for clarification if somethings doesn't make sense.
Using Filemaker v6.04
Part setup (top to bottom)
--> Leading Grand Summary
--> Sub-summary b Project Name (leading)
--> Sub-summary by SiteID (leading)
--> Body
--> Sub-summary by Total # of calls (trailing)
--> Sub-summary by total minutes
--> Sub-summary by PROJ_SITE******* <<-this is the one I think is the
troublemaker
--> Sub-summary by Project Name (Trailing)
Image of Report (as best as I can do it in ascii) when completed
======================================================
Monthly Site Report
------------------------------
PROJECT NAME: MICKEY
SITEID: ABC
Control # Site ID Date Proj Name Total calls
Total Minutes
-------------- -------------- --------------
-------------- -------------- --------------
12345 ABC 08-13-07 MICKEY 1
00:12
23456 ABC 08-13-07 MICKEY 2
00:20
SITE: DEF
Control # Site ID Date Proj Name Total calls
Total Minutes
-------------- -------------- --------------
-------------- -------------- --------------
34567 DEF 08-01-07 MICKEY 3
00:20
SITE: GHI
Control # Site ID Date Proj Name Total calls
Total Minutes
-------------- -------------- --------------
-------------- -------------- --------------
34567 GHI 08-06-07 MICKEY
6 01:05
----------------------------------------------------------------------------------------------------------
Total Control #: 6
Total # of Sites: ???
Total # of Calls: 16
Total # of Time: 02:15
======================================================
Now, also on the report are other project summaries. What our people
are tracking is the number of calls related to a particular Control #,
how long the sum of the calls are, and of course, what sites are
calling in for help on any particular project.
All of the sub-summaries are set up so that at the end of every
Project Grouping, I also get a summary of Total # of Control # log
entries made, Total # of calls made on this project, Total number of
Minutes of assistance given on this project, and total # of Sites
calling in.
My issue is that no matter what I do, I cannot make the Total # of
Sites calculation come up correct. Everything else calculates fine
and gives me summaries for all the projects as expected.
If anyone thinks they can be of assistance on this problem, I'd be
happy to send them a clone with sample information in it, or screen
shots of how I have my layout made out.
I know I probably need to use variable lists, but I just cannot get my
head wrapped around how to calculate totals using them. I feel so
completely out of my league on this problem. Help!
- Teresa K.
.
- Follow-Ups:
- Prev by Date: Re: weight of empty fields
- Next by Date: Re: One last time... Sub summaries, variable lists, and whatnot...
- Previous by thread: weight of empty fields
- Next by thread: Re: One last time... Sub summaries, variable lists, and whatnot...
- Index(es):
Relevant Pages
|