Fanuc Oi-Mc Control Sub Program Call?
- From: seanmc23@xxxxxxxxxxx
- Date: 1 Sep 2006 11:28:31 -0700
I have a long program that I need to let run un-attended over the
weeekend.
Because of the half-assed system we have for loading our programs here,
I need to run this program in 2 parts.
I will be DNC-ing the main program off a Flash memory card. Can I call
another program off the card as a sub-program (M99) during this DNC
run?
-----------------------------------
Main #0100
G20
O100
(LEADWELL/FANUC)
G28 G91 Z0
T1 M6
G0 G54 G90 G40 G49 G80 G99
M3 S8000
X-11.1092 Y-6.9612
M5
G0 G90 G54 X0
G28 G91 Y0
T1 M6
M99 P0102
M30
Sub #0101
G20
O101
(LEADWELL/FANUC)
G28 G91 Z0
T1 M6
G0 G54 G90 G40 G49 G80 G99
M3 S8000
X-11.1092 Y-6.9612
M5
G0 G90 G54 X0
G28 G91 Y0
T1 M6
M99
What am I doing wrong
Thanks - Sean
.
- Follow-Ups:
- Re: Fanuc Oi-Mc Control Sub Program Call?
- From: Beege
- Re: Fanuc Oi-Mc Control Sub Program Call?
- Prev by Date: Re: Survey: Do You "Dry Run" Your Programs?
- Next by Date: any advice on where to start to build my own CNC machine?
- Previous by thread: Hass OM
- Next by thread: Re: Fanuc Oi-Mc Control Sub Program Call?
- Index(es):