Re: Removable fasteners for automated assembly/disassembly




"Cliff" <Clhuprich@xxxxxxx> wrote in message
news:046uu19o0f2kjiuv7lktidtdo9rctpq6om@xxxxxxxxxx

It doesn't sound like such is being fully used any more than CNC
is.

As it's not my job to design the dies, I'm not sure what the deal is in
engineering. The die build cycles are so long that practices typically
evolve every one or two die sets. As far as CNC, they don't want to spend
the machine time to drill and tap holes on the CNCs but they machine shop is
very profecient at cutting 3d "working" surfaces.

Evem DROs on manual machines might be a help .... IF you have
good CAD data & prints to begin with.

It's not that the machines are incapable, it's just that they're not being
used for these purposes (yet).

Regards,

Robin


.



Relevant Pages

  • Re: The economics of drilling holes...
    ... >> Joe and Anthony, ... While a group of parts from one die ... >> no two hole locations are the same (for fool-proofing and to ... If they are starting with CAD data at some point the CNC ...
    (alt.machines.cnc)
  • Re: KT boundry event
    ... review the Sachs quote, and substitute 'purposiveness'. ... Wortschatzes gar bald eine fühlbare Verarmung der Sprache ... herbeiführen; die Wissenschaft hat nicht die Worte, ... I am no German expert but 'design' seems to stray so far from the ...
    (talk.origins)
  • Re: Bad Circuits in the Wild
    ... If we didnt have hardware interlock and over-current protection, every time he did that the hardware would die. ... Because we had the relevant hardware (which is cheap and easy to design) the unit just kept working. ... three drives in a row did that. ...
    (sci.electronics.design)
  • Re: DRC ERROR "minimum density"
    ... be required at both chip level or 'window' level. ... Suppose your die size is 1000um*1000um. ... those pieces of metals are adding some parasitic to your true design. ...
    (comp.cad.cadence)
  • Re: Miliband on Radio Five Live
    ... 1700 Incur the wrath of the King and die ... were jacking the floor up (as in build, jack, build next under, jack. ... It was an advanced design with an ... lift) on the senior Architect of the firm that designed the building. ...
    (uk.rec.waterways)