When mixing on site, how much concrete could one guy pour and finish in one day?



With a small electric concrete mixer (2 bags of 60# or 80# ready mix at a
time) I'm not able to mix much more than an area of 6' x 12' by 4" thick,
anymore I'm not able to finish before it sets in. That was about 44 bags of
60# of ready mix.

Would having two small mixers on at the same time increase productivity? I
don't think I could, or want to, do more than 100 60# bags day.


.



Relevant Pages